Client: Verdant Brewing Co.
Location: Kernick Industrial Estate, Penryn
Status: Commenced April 2021
This project includes the full reworking of an industrial unit for a local brewery. We are work closely with the client and the designer, Zelah Studio.
The Tap room will be a local event space for both Verdant events and public hire. It should have a capacity of up to 200 people and facilities to suit.
It has been suggested to open up the South-West corner of the building to provide greater light and allow for the ground floor Tap room to flow onto Outside Space for summer events.
The offices are to house up to 15 staff and will include; a Meeting Room, Communal Office space, Storage and Kitchen facilities. The offices are to have views to the Brewery floor and a mezzanine level above the Tap room is desirable.
The separate ‘Floor staff Hub’ is to be positioned at the opposing end of the Cold store and will provide a Boot room for up to 10 staff.
There is to be a Shower and Toilet provided but the main toilet block will be within the Office/ Tap end of the brewery.
The Workshop is provided for equipment storage and small repairs only. The Lab is on the first floor and is to be accessed via steps which also serve the storage area on the upper level.